This drawing
explains that it is necessary to have a good level
to be able to sub-contract a work. Else the sub-contractor
will be stronger than we are. This is another way to
say that to sub-contract something we must be able to
do it by ourself... Here the sub-contractor has a very
high level (CMMI 5) while the customer's level is very
low (CMMI 1).
|