This drawing
explains that it is necessary to choose a sub-contractor
that have a good enough level
to be able to successfully sub-contract a work. Else the sub-contractor
will be lost and enable to succeed deliveries. Here the sub-contractor has a very
low level (CMMI 1) while the customer's level is very
high (CMMI 5).
|